Constructions on the Property
The buildings, facilities, and infrastructure already constructed are:
Main building
Overlooks the beach and is built in Spanish Mediterranean style. Layout of the building consists of the ground floor with a full marble tiled lobby, with a 13 meters high atrium. A restaurant, bar, and kitchen are further located on the ground floor. The first floor consists of an eight room with surrounding terraces.
(see floor plan main building ground floor for more details)
Rooms
Divided into two wings on each side of the main building, the North-wing contains 10 rooms and the South-wing contains 20 rooms. The rooms are 48 square meters each, all provided with large bathrooms and a balcony of 12 square meters. All rooms have sea view to the west and would allow the occupants to enjoy the wonderful sunsets.
(see floor plans North wing, South wing and room layout)
Facility centre
The 1200 square meter facility centre is divided into fourteen different rooms including a 160 square meter boathouse and a 340 square meter drive-in patio. All of which have covered terraces.
(see floor plan facility center).
60 meter long pier
Has been constructed out of natural materials to prevent sand washout from the beach.
Gatehouse
The 120 square meter gatehouse with connecting building for generators and water treatment equipment is located at the southeast side of the property.
Water tower
The 22 m³ water tower is located close to the gate house within the perimeters of the property.
Water canal
The 200 meter long water disposal canal runs from beside the gatehouse to the coast preventing any possible floods on the property
Fencing
A one thousand meter long and 4 meter high wall surrounds the property for total privacy and security.
The construction of the buildings is at an advanced stage. The buildings and infrastructure are for 80% completed. An additional capital of approximately 1 million US dollar is needed for further completion of the current buildings, facilities, and infrastructure. Six to eight months would be required to complete the construction and development of the property*.
*The completion time and costs depends greatly on the final usage of the property.